EV Station Lot Sp Ng Braselton
AvailableEV charging station in Braselton, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 104559.
At a glance
EV Station Lot Sp Ng Braselton is a public EV charging station at 1400 River Pl in Braselton, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 7, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 104559 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 7, 2018 |
| Last updated at source | Oct 19, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1400 River Pl
- City
- Braselton
- State
- Georgia
- ZIP
- 30517
- Coordinates
- 34.12055, -83.83782
Within ~15 km
Nearby charging
- Fuqua (Exchange at Gwinnette)24 ports
EnviroSpark · Available
- Oakwood, GA - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- Mall of Georgia6 ports
EVgo · Available
- Fort Yargo State Park6 ports
Rivian Waypoints · Available
Electrify America · Available
What kind of charging does EV Station Lot Sp Ng Braselton offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does EV Station Lot Sp Ng Braselton compare with other stations in Braselton?
Braselton has 7 charging stations in the DOE registry with 15 ports. EV Station Lot Sp Ng Braselton accounts for 13% of the charging ports in Braselton. ChargePoint runs 6 stations in Braselton. Statewide, Georgia has 2,544 stations and 8,768 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates EV Station Lot Sp Ng Braselton?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,969 stations in the registry across 52 states, with 5,026 DC fast and 83,347 Level 2 ports in total. 1,429 of those stations are in Georgia, 56% of the state's 2,544.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 7, 2018, one of 74 stations in Georgia with a 2018 open date. The station's record was last updated at the source on Oct 19, 2026.
Frequently asked questions
How many chargers does EV Station Lot Sp Ng Braselton have?
EV Station Lot Sp Ng Braselton has 2 charging ports: 2 Level 2.
Does EV Station Lot Sp Ng Braselton have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does EV Station Lot Sp Ng Braselton have?
EV Station Lot Sp Ng Braselton has J1772 connectors.
Is EV Station Lot Sp Ng Braselton open to the public?
Yes. EV Station Lot Sp Ng Braselton is listed with public access, and its status is available.
Where is EV Station Lot Sp Ng Braselton?
EV Station Lot Sp Ng Braselton is at 1400 River Pl, Braselton, GA 30517. Its coordinates are 34.12055, -83.83782.
More EV charging around Braselton
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 104559, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 19, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “EV Station Lot Sp Ng Braselton, Braselton, GA (AFDC station 104559)”, https://chargecensus.com/stations/georgia/ev-station-lot-sp-ng-braselton-104559 (data as of October 19, 2026).