ChargeCensus

Encoreotg Encore EV 2

Available

EV charging station in Garden City, Georgia on the ChargePoint network — 1 Level 2. US DOE AFDC station 386856.

At a glance

Encoreotg Encore EV 2 is a public EV charging station at 125 Town Center Drive in Garden City, Georgia, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 26, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID386856
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 26, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
125 Town Center Drive
City
Garden City
State
Georgia
ZIP
31405
Coordinates
32.06206, -81.20661

Within ~15 km

Nearby charging

What kind of charging does Encoreotg Encore EV 2 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Encoreotg Encore EV 2 compare with other stations in Garden City?

Garden City has 6 charging stations in the DOE registry with 17 ports. Encoreotg Encore EV 2 accounts for 6% of the charging ports in Garden City. ChargePoint runs 2 stations in Garden City. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Encoreotg Encore EV 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 26, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Encoreotg Encore EV 2 have?

Encoreotg Encore EV 2 has 1 charging port: 1 Level 2.

Does Encoreotg Encore EV 2 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Encoreotg Encore EV 2 have?

Encoreotg Encore EV 2 has J1772 connectors.

Is Encoreotg Encore EV 2 open to the public?

Yes. Encoreotg Encore EV 2 is listed with public access, and its status is available.

Where is Encoreotg Encore EV 2?

Encoreotg Encore EV 2 is at 125 Town Center Drive, Garden City, GA 31405. Its coordinates are 32.06206, -81.20661.

More EV charging around Garden City

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 386856, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Encoreotg Encore EV 2, Garden City, GA (AFDC station 386856)”, https://chargecensus.com/stations/georgia/encoreotg-encore-ev-2-386856 (data as of October 12, 2026).