Druid Pointe Parking Lot
AvailableEV charging station in Atlanta, Georgia on the Blink network — 2 Level 2. US DOE AFDC station 397016.
At a glance
Druid Pointe Parking Lot is a public EV charging station at 2751 Buford Highway Northeast in Atlanta, Georgia, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 18, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 397016 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 18, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- South Atlanta Ga Sdc236 ports
Non-networked · Available
- Electric Owl Holdings48 ports
EnviroSpark · Available
- Truist Headquarters Garage42 ports
Flash · Available
- Allora Eastland40 ports
Blink · Available
- Bellamy Executive Park32 ports
Blink · Available
- Atlanta, GA - Tesla Supercharger30 ports
Tesla Supercharger · Available
What kind of charging does Druid Pointe Parking Lot offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Druid Pointe Parking Lot compare with other stations in Atlanta?
Atlanta has 773 charging stations in the DOE registry with 2,748 ports, the most of 243 cities and towns in Georgia. Druid Pointe Parking Lot accounts for under 1% of the charging ports in Atlanta. Blink runs 73 stations in Atlanta. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Druid Pointe Parking Lot?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 201 of those stations are in Georgia, 8% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 18, 2022, one of 219 stations in Georgia with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Druid Pointe Parking Lot have?
Druid Pointe Parking Lot has 2 charging ports: 2 Level 2.
Does Druid Pointe Parking Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Druid Pointe Parking Lot have?
Druid Pointe Parking Lot has J1772 connectors.
Is Druid Pointe Parking Lot open to the public?
Yes. Druid Pointe Parking Lot is listed with public access, and its status is available.
Where is Druid Pointe Parking Lot?
Druid Pointe Parking Lot is at 2751 Buford Highway Northeast, Atlanta, GA 30324. Its coordinates are 33.82900, -84.34434.
More EV charging around Atlanta
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 397016, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Druid Pointe Parking Lot, Atlanta, GA (AFDC station 397016)”, https://chargecensus.com/stations/georgia/druid-pointe-parking-lot-397016 (data as of October 12, 2026).