EV charging station in Cumming, Georgia on the evGateway network — 2 DC fast. US DOE AFDC station 376501.

At a glance

Don Jackson Jeep is a public EV charging station at 5855 GA-400 in Cumming, Georgia, on the evGateway network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as temporarily unavailable, open since Jan 28, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID376501
NetworkevGateway
StatusTemporarily unavailable (T)
AccessPublic
Open dateJan 28, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

evGateway

Operates 481 stations in the DOE registry — view the full network →

Location

Address
5855 GA-400
State
Georgia
ZIP
30028
Coordinates
34.31048, -84.06753

Within ~15 km

Nearby charging

What kind of charging does Don Jackson Jeep offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Don Jackson Jeep compare with other stations in Cumming?

Cumming has 24 charging stations in the DOE registry with 163 ports, the 19th-most of 243 cities and towns in Georgia. Don Jackson Jeep accounts for 1% of the charging ports in Cumming. evGateway runs 2 stations in Cumming. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Don Jackson Jeep?

evGateway operates 481 stations in the registry across 42 states, with 560 DC fast and 2,523 Level 2 ports in total. 14 of those stations are in Georgia, under 1% of the state's 2,545.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 28, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Don Jackson Jeep have?

Don Jackson Jeep has 2 charging ports: 2 DC fast.

Does Don Jackson Jeep have DC fast charging?

Yes. The registry lists 2 DC fast ports at Don Jackson Jeep, with CCS connectors.

What connectors does Don Jackson Jeep have?

Don Jackson Jeep has CCS connectors.

Is Don Jackson Jeep open to the public?

Yes. Don Jackson Jeep is listed with public access, and its status is temporarily unavailable.

Where is Don Jackson Jeep?

Don Jackson Jeep is at 5855 GA-400, Cumming, GA 30028. Its coordinates are 34.31048, -84.06753.

More EV charging around Cumming

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 376501, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Don Jackson Jeep, Cumming, GA (AFDC station 376501)”, https://chargecensus.com/stations/georgia/don-jackson-jeep-376501 (data as of October 12, 2026).