City Hall Building
AvailableEV charging station in Atlanta, Georgia on the Noodoe network — 2 Level 2. US DOE AFDC station 388487.
At a glance
City Hall Building is a public EV charging station at 5440 Fulton Industrial Blvd SW in Atlanta, Georgia, on the Noodoe network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 24, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 388487 |
| Network | Noodoe |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 24, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- South Atlanta Ga Sdc236 ports
Non-networked · Available
- Peachy Airport Parking60 ports
Non-networked · Available
- Peachy Airport Indoor31 ports
Flash · Available
- Austell, GA - Tesla Supercharger24 ports
Tesla Supercharger · Available
Non-networked · Available
- Truist Park Red Deck18 ports
Flash · Available
What kind of charging does City Hall Building offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does City Hall Building compare with other stations in Atlanta?
Atlanta has 773 charging stations in the DOE registry with 2,748 ports, the most of 243 cities and towns in Georgia. City Hall Building accounts for under 1% of the charging ports in Atlanta. Noodoe runs 4 stations in Atlanta. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates City Hall Building?
Noodoe operates 385 stations in the registry across 38 states, with 296 DC fast and 1,731 Level 2 ports in total. 16 of those stations are in Georgia, under 1% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 24, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does City Hall Building have?
City Hall Building has 2 charging ports: 2 Level 2.
Does City Hall Building have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does City Hall Building have?
City Hall Building has J1772 connectors.
Is City Hall Building open to the public?
Yes. City Hall Building is listed with public access, and its status is available.
Where is City Hall Building?
City Hall Building is at 5440 Fulton Industrial Blvd SW, Atlanta, GA 30336. Its coordinates are 33.73921, -84.56475.
More EV charging around Atlanta
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 388487, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “City Hall Building, Atlanta, GA (AFDC station 388487)”, https://chargecensus.com/stations/georgia/city-hall-building-388487 (data as of October 12, 2026).