Arcadia Building 6
AvailableEV charging station in Cartersville, Georgia on the Autel network — 2 Level 2. US DOE AFDC station 390290.
At a glance
Arcadia Building 6 is a public EV charging station at 75 Overlook Pkwy in Cartersville, Georgia, on the Autel network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 4, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 390290 |
| Network | Autel |
| Status | Available (E) |
| Access | Public |
| Facility | Multi-unit dwelling |
| Open date | Feb 4, 2025 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.30 per kWh
Location
- Address
- 75 Overlook Pkwy
- City
- Cartersville
- State
- Georgia
- ZIP
- 30121
- Coordinates
- 34.17777, -84.75604
Within ~15 km
Nearby charging
- Acworth, GA - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- Pugmire Ford of Cartersville4 ports
Ford Charge · Available
Tesla Destination · Available
Blink · Available
ChargePoint · Available
What kind of charging does Arcadia Building 6 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.30 per kWh”. The site is listed as a multi-unit dwelling location.
How does Arcadia Building 6 compare with other stations in Cartersville?
Cartersville has 24 charging stations in the DOE registry with 39 ports, the 17th-most of 243 cities and towns in Georgia. Arcadia Building 6 accounts for 5% of the charging ports in Cartersville. It is the only Autel station in Cartersville. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Arcadia Building 6?
Autel operates 77 stations in the registry across 20 states, with 117 DC fast and 293 Level 2 ports in total. 11 of those stations are in Georgia, under 1% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 4, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Arcadia Building 6 have?
Arcadia Building 6 has 2 charging ports: 2 Level 2.
Does Arcadia Building 6 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Arcadia Building 6 have?
Arcadia Building 6 has J1772 connectors.
Is charging at Arcadia Building 6 free?
Pricing as reported to the DOE registry: $0.30 per kWh.
Is Arcadia Building 6 open to the public?
Yes. Arcadia Building 6 is listed with public access, and its status is available.
Where is Arcadia Building 6?
Arcadia Building 6 is at 75 Overlook Pkwy, Cartersville, GA 30121. Its coordinates are 34.17777, -84.75604.
More EV charging around Cartersville
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 390290, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Arcadia Building 6, Cartersville, GA (AFDC station 390290)”, https://chargecensus.com/stations/georgia/arcadia-building-6-390290 (data as of October 12, 2026).