ChargeCensus

Aip Madison 1

Available

EV charging station in Madison, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 397044.

At a glance

Aip Madison 1 is a public EV charging station at 100 Amtico Road in Madison, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 28, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID397044
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 28, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
100 Amtico Road
City
Madison
State
Georgia
ZIP
30650
Coordinates
33.55759, -83.48112

Within ~15 km

Nearby charging

What kind of charging does Aip Madison 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Aip Madison 1 compare with other stations in Madison?

Madison has 8 charging stations in the DOE registry with 34 ports. Aip Madison 1 accounts for 6% of the charging ports in Madison. ChargePoint runs 5 stations in Madison. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Aip Madison 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 28, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Aip Madison 1 have?

Aip Madison 1 has 2 charging ports: 2 Level 2.

Does Aip Madison 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Aip Madison 1 have?

Aip Madison 1 has J1772 connectors.

Is Aip Madison 1 open to the public?

Yes. Aip Madison 1 is listed with public access, and its status is available.

Where is Aip Madison 1?

Aip Madison 1 is at 100 Amtico Road, Madison, GA 30650. Its coordinates are 33.55759, -83.48112.

More EV charging around Madison

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 397044, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Aip Madison 1, Madison, GA (AFDC station 397044)”, https://chargecensus.com/stations/georgia/aip-madison-1-397044 (data as of October 12, 2026).