ChargeCensus

1974 Ga-40 E

Available

EV charging station in Kingsland, Georgia on the EV Connect network — 2 DC fast. US DOE AFDC station 434173.

At a glance

1974 Ga-40 E is a public EV charging station at 1974 GA-40 E in Kingsland, Georgia, on the EV Connect network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Oct 23, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID434173
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateOct 23, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
1974 GA-40 E
City
Kingsland
State
Georgia
ZIP
31548
Coordinates
30.78170, -81.62731

Within ~15 km

Nearby charging

What kind of charging does 1974 Ga-40 E offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does 1974 Ga-40 E compare with other stations in Kingsland?

Kingsland has 7 charging stations in the DOE registry with 30 ports. 1974 Ga-40 E accounts for 7% of the charging ports in Kingsland. It is the only EV Connect station in Kingsland. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates 1974 Ga-40 E?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 26 of those stations are in Georgia, 1% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 23, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 1974 Ga-40 E have?

1974 Ga-40 E has 2 charging ports: 2 DC fast.

Does 1974 Ga-40 E have DC fast charging?

Yes. The registry lists 2 DC fast ports at 1974 Ga-40 E, with CCS connectors.

What connectors does 1974 Ga-40 E have?

1974 Ga-40 E has CCS connectors.

Is 1974 Ga-40 E open to the public?

Yes. 1974 Ga-40 E is listed with public access, and its status is available.

Where is 1974 Ga-40 E?

1974 Ga-40 E is at 1974 GA-40 E, Kingsland, GA 31548. Its coordinates are 30.78170, -81.62731.

More EV charging around Kingsland

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 434173, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “1974 Ga-40 E, Kingsland, GA (AFDC station 434173)”, https://chargecensus.com/stations/georgia/1974-ga-40-e-434173 (data as of October 12, 2026).