ChargeCensus

Westgate (Lakes)

Available

EV charging station in Orlando, Florida on the Blink network — 2 Level 2. US DOE AFDC station 148928.

At a glance

Westgate (Lakes) is a public EV charging station at 10000 Turkey Lake Road in Orlando, Florida, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 27, 2013.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID148928
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateNov 27, 2013
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.50/kWh Energy Fee

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
10000 Turkey Lake Road
State
Florida
ZIP
32819
Coordinates
28.42562, -81.47666

Within ~15 km

Nearby charging

What kind of charging does Westgate (Lakes) offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.50/kWh Energy Fee”.

How does Westgate (Lakes) compare with other stations in Orlando?

Orlando has 344 charging stations in the DOE registry with 1,515 ports, the 2nd-most of 381 cities and towns in Florida. Westgate (Lakes) accounts for under 1% of the charging ports in Orlando. Blink runs 38 stations in Orlando. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Westgate (Lakes)?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 698 of those stations are in Florida, 14% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 27, 2013, one of 32 stations in Florida with a 2013 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Westgate (Lakes) have?

Westgate (Lakes) has 2 charging ports: 2 Level 2.

Does Westgate (Lakes) have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Westgate (Lakes) have?

Westgate (Lakes) has J1772 connectors.

Is charging at Westgate (Lakes) free?

Pricing as reported to the DOE registry: $0.50/kWh Energy Fee.

Is Westgate (Lakes) open to the public?

Yes. Westgate (Lakes) is listed with public access, and its status is available.

Where is Westgate (Lakes)?

Westgate (Lakes) is at 10000 Turkey Lake Road, Orlando, FL 32819. Its coordinates are 28.42562, -81.47666.

More EV charging around Orlando

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 148928, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Westgate (Lakes), Orlando, FL (AFDC station 148928)”, https://chargecensus.com/stations/florida/westgate-lakes-148928 (data as of October 12, 2026).