ChargeCensus

University of Central Florida - B0016A

Available

EV charging station in Orlando, Florida on the evGateway network — 12 Level 2. US DOE AFDC station 333796.

At a glance

University of Central Florida - B0016A is a public EV charging station at 3528 Perseus Loop in Orlando, Florida, on the evGateway network. It has 12 charging ports (12 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 5, 2024.

Total ports
12
DC fast
0
Level 2
12
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID333796
NetworkevGateway
StatusAvailable (E)
AccessPublic
Open dateFeb 5, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

evGateway

Operates 481 stations in the DOE registry — view the full network →

Location

Address
3528 Perseus Loop
State
Florida
ZIP
32816
Coordinates
28.59174, -81.19690

Within ~15 km

Nearby charging

What kind of charging does University of Central Florida - B0016A offer?

Of its 12 ports, 12 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.4 times the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does University of Central Florida - B0016A compare with other stations in Orlando?

Orlando has 344 charging stations in the DOE registry with 1,515 ports, the 2nd-most of 381 cities and towns in Florida. University of Central Florida - B0016A accounts for under 1% of the charging ports in Orlando. evGateway runs 3 stations in Orlando. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates University of Central Florida - B0016A?

evGateway operates 481 stations in the registry across 42 states, with 560 DC fast and 2,523 Level 2 ports in total. 16 of those stations are in Florida, under 1% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 5, 2024, one of 804 stations in Florida with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does University of Central Florida - B0016A have?

University of Central Florida - B0016A has 12 charging ports: 12 Level 2.

Does University of Central Florida - B0016A have DC fast charging?

No. The registry lists no DC fast ports here; its 12 ports are all Level 2.

What connectors does University of Central Florida - B0016A have?

University of Central Florida - B0016A has J1772 connectors.

Is University of Central Florida - B0016A open to the public?

Yes. University of Central Florida - B0016A is listed with public access, and its status is available.

Where is University of Central Florida - B0016A?

University of Central Florida - B0016A is at 3528 Perseus Loop, Orlando, FL 32816. Its coordinates are 28.59174, -81.19690.

More EV charging around Orlando

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 333796, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “University of Central Florida - B0016A, Orlando, FL (AFDC station 333796)”, https://chargecensus.com/stations/florida/university-of-central-florida-b0016a-333796 (data as of October 12, 2026).