The Collective Station 3
AvailableEV charging station in Gainesville, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 322871.
At a glance
The Collective Station 3 is a public EV charging station at 9178 SW 72nd Ln in Gainesville, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 16, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 322871 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 16, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 9178 SW 72nd Ln
- City
- Gainesville
- State
- Florida
- ZIP
- 32608
- Coordinates
- 29.58743, -82.43907
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Celebration Pointe20 ports
Blink · Available
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does The Collective Station 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Collective Station 3 compare with other stations in Gainesville?
Gainesville has 60 charging stations in the DOE registry with 195 ports, the 15th-most of 381 cities and towns in Florida. The Collective Station 3 accounts for 1% of the charging ports in Gainesville. ChargePoint runs 32 stations in Gainesville. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates The Collective Station 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 16, 2023, one of 612 stations in Florida with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Collective Station 3 have?
The Collective Station 3 has 2 charging ports: 2 Level 2.
Does The Collective Station 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Collective Station 3 have?
The Collective Station 3 has J1772 connectors.
Is The Collective Station 3 open to the public?
Yes. The Collective Station 3 is listed with public access, and its status is available.
Where is The Collective Station 3?
The Collective Station 3 is at 9178 SW 72nd Ln, Gainesville, FL 32608. Its coordinates are 29.58743, -82.43907.
More EV charging around Gainesville
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 322871, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Collective Station 3, Gainesville, FL (AFDC station 322871)”, https://chargecensus.com/stations/florida/the-collective-station-3-322871 (data as of October 12, 2026).