TA US-301 S, Baldwin, FL
AvailableEV charging station in Baldwin, Florida on the bp pulse network — 12 DC fast. US DOE AFDC station 448742.
At a glance
TA US-301 S, Baldwin, FL is a public EV charging station at 1024 US-301 S in Baldwin, Florida, on the bp pulse network. It has 12 charging ports (12 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Jan 3, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 448742 |
| Network | bp pulse |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 3, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1024 US-301 S
- City
- Baldwin
- State
- Florida
- ZIP
- 32234
- Coordinates
- 30.28523, -81.98346
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Blink · Available
- Starbucks4 ports
FPL EVolution · Available
- Waffle House Baldwin4 ports
Blink · Temporarily unavailable
- Jaa Cecil Airport 12 ports
ChargePoint · Available
What kind of charging does TA US-301 S, Baldwin, FL offer?
Of its 12 ports, 12 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 3.4 times the Florida average of 3.5 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.
How does TA US-301 S, Baldwin, FL compare with other stations in Baldwin?
Baldwin has 2 charging stations in the DOE registry with 16 ports. TA US-301 S, Baldwin, FL accounts for 75% of the charging ports in Baldwin. It is the only bp pulse station in Baldwin. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates TA US-301 S, Baldwin, FL?
bp pulse operates 95 stations in the registry across 20 states, with 870 DC fast ports in total. 17 of those stations are in Florida, under 1% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 3, 2026, one of 554 stations in Florida with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does TA US-301 S, Baldwin, FL have?
TA US-301 S, Baldwin, FL has 12 charging ports: 12 DC fast.
Does TA US-301 S, Baldwin, FL have DC fast charging?
Yes. The registry lists 12 DC fast ports at TA US-301 S, Baldwin, FL, with CCS and NACS (Tesla) connectors.
What connectors does TA US-301 S, Baldwin, FL have?
TA US-301 S, Baldwin, FL has CCS and NACS (Tesla) connectors.
Is TA US-301 S, Baldwin, FL open to the public?
Yes. TA US-301 S, Baldwin, FL is listed with public access, and its status is available.
Where is TA US-301 S, Baldwin, FL?
TA US-301 S, Baldwin, FL is at 1024 US-301 S, Baldwin, FL 32234. Its coordinates are 30.28523, -81.98346.
More EV charging around Baldwin
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 448742, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “TA US-301 S, Baldwin, FL, Baldwin, FL (AFDC station 448742)”, https://chargecensus.com/stations/florida/ta-us-301-s-baldwin-fl-448742 (data as of October 12, 2026).