ChargeCensus

Rollins College Truist Garage

Available

EV charging station in Winter Park, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 221430.

At a glance

Rollins College Truist Garage is a public EV charging station at 131 E Comstock Ave in Winter Park, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 17, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID221430
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 17, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
131 E Comstock Ave
State
Florida
ZIP
32789
Coordinates
28.59443, -81.34971

Within ~15 km

Nearby charging

What kind of charging does Rollins College Truist Garage offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Rollins College Truist Garage compare with other stations in Winter Park?

Winter Park has 43 charging stations in the DOE registry with 97 ports, the 25th-most of 381 cities and towns in Florida. Rollins College Truist Garage accounts for 2% of the charging ports in Winter Park. ChargePoint runs 35 stations in Winter Park. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Rollins College Truist Garage?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 17, 2022, one of 622 stations in Florida with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Rollins College Truist Garage have?

Rollins College Truist Garage has 2 charging ports: 2 Level 2.

Does Rollins College Truist Garage have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Rollins College Truist Garage have?

Rollins College Truist Garage has J1772 connectors.

Is Rollins College Truist Garage open to the public?

Yes. Rollins College Truist Garage is listed with public access, and its status is available.

Where is Rollins College Truist Garage?

Rollins College Truist Garage is at 131 E Comstock Ave, Winter Park, FL 32789. Its coordinates are 28.59443, -81.34971.

More EV charging around Winter Park

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 221430, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Rollins College Truist Garage, Winter Park, FL (AFDC station 221430)”, https://chargecensus.com/stations/florida/rollins-college-truist-garage-221430 (data as of October 12, 2026).