ChargeCensus

Palmaris Gateway

Available

EV charging station in St. Petersburg, Florida on the Blink network — 4 Level 2. US DOE AFDC station 452055.

At a glance

Palmaris Gateway is a public EV charging station at 540 Trinity Lane North in St. Petersburg, Florida, on the Blink network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 27, 2026.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID452055
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateFeb 27, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
540 Trinity Lane North
State
Florida
ZIP
33716
Coordinates
27.88239, -82.65768

Within ~15 km

Nearby charging

What kind of charging does Palmaris Gateway offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 14% above the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Palmaris Gateway compare with other stations in St. Petersburg?

St. Petersburg has 50 charging stations in the DOE registry with 155 ports, the 19th-most of 381 cities and towns in Florida. Palmaris Gateway accounts for 3% of the charging ports in St. Petersburg. Blink runs 6 stations in St. Petersburg. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Palmaris Gateway?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 698 of those stations are in Florida, 14% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 27, 2026, one of 554 stations in Florida with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Palmaris Gateway have?

Palmaris Gateway has 4 charging ports: 4 Level 2.

Does Palmaris Gateway have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Palmaris Gateway have?

Palmaris Gateway has J1772 connectors.

Is Palmaris Gateway open to the public?

Yes. Palmaris Gateway is listed with public access, and its status is available.

Where is Palmaris Gateway?

Palmaris Gateway is at 540 Trinity Lane North, St. Petersburg, FL 33716. Its coordinates are 27.88239, -82.65768.

More EV charging around St. Petersburg

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 452055, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Palmaris Gateway, St. Petersburg, FL (AFDC station 452055)”, https://chargecensus.com/stations/florida/palmaris-gateway-452055 (data as of October 12, 2026).