ChargeCensus

Npc 5800 North Building

Available

EV charging station in St. Petersburg, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 450120.

At a glance

Npc 5800 North Building is a public EV charging station at 5880 49th Street N in St. Petersburg, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID450120
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5880 49th Street N
State
Florida
ZIP
33709
Coordinates
27.82550, -82.70031

Within ~15 km

Nearby charging

What kind of charging does Npc 5800 North Building offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Npc 5800 North Building compare with other stations in St. Petersburg?

St. Petersburg has 50 charging stations in the DOE registry with 155 ports, the 19th-most of 381 cities and towns in Florida. Npc 5800 North Building accounts for 1% of the charging ports in St. Petersburg. ChargePoint runs 15 stations in St. Petersburg. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Npc 5800 North Building?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2026, one of 554 stations in Florida with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Npc 5800 North Building have?

Npc 5800 North Building has 2 charging ports: 2 Level 2.

Does Npc 5800 North Building have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Npc 5800 North Building have?

Npc 5800 North Building has J1772 connectors.

Is Npc 5800 North Building open to the public?

Yes. Npc 5800 North Building is listed with public access, and its status is available.

Where is Npc 5800 North Building?

Npc 5800 North Building is at 5880 49th Street N, St. Petersburg, FL 33709. Its coordinates are 27.82550, -82.70031.

More EV charging around St. Petersburg

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 450120, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Npc 5800 North Building, St. Petersburg, FL (AFDC station 450120)”, https://chargecensus.com/stations/florida/npc-5800-north-building-450120 (data as of October 12, 2026).