Mazda Lakeland Front Lot
AvailableEV charging station in Lakeland, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 311730.
At a glance
Mazda Lakeland Front Lot is a public EV charging station at 4317 US Hwy 98 S in Lakeland, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 28, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 311730 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 28, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Dunkin' - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Destination · Available
- Walmart EV Charging8 ports
Walmart · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Lakeland Airport4 ports
ChargeUp · Available
What kind of charging does Mazda Lakeland Front Lot offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mazda Lakeland Front Lot compare with other stations in Lakeland?
Lakeland has 35 charging stations in the DOE registry with 100 ports. Mazda Lakeland Front Lot accounts for 2% of the charging ports in Lakeland. ChargePoint runs 15 stations in Lakeland. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Mazda Lakeland Front Lot?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 28, 2023, one of 612 stations in Florida with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mazda Lakeland Front Lot have?
Mazda Lakeland Front Lot has 2 charging ports: 2 Level 2.
Does Mazda Lakeland Front Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mazda Lakeland Front Lot have?
Mazda Lakeland Front Lot has J1772 connectors.
Is Mazda Lakeland Front Lot open to the public?
Yes. Mazda Lakeland Front Lot is listed with public access, and its status is available.
Where is Mazda Lakeland Front Lot?
Mazda Lakeland Front Lot is at 4317 US Hwy 98 S, Lakeland, FL 33812. Its coordinates are 27.98778, -81.89425.
More EV charging around Lakeland
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 311730, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mazda Lakeland Front Lot, Lakeland, FL (AFDC station 311730)”, https://chargecensus.com/stations/florida/mazda-lakeland-front-lot-311730 (data as of October 12, 2026).