Maitland Sunrail
AvailableEV charging station in Maitland, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 330229.
At a glance
Maitland Sunrail is a public EV charging station at 853 N Orlando Ave in Maitland, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 13, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 330229 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 13, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- VISN 8/Orlando VAMC (675)_Mobile20 ports
Non-networked · Available
- Robinson Hub18 ports
ChargeUp · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
ChargeUp · Available
- Gardenia14 ports
ChargeUp · Available
What kind of charging does Maitland Sunrail offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Maitland Sunrail compare with other stations in Maitland?
Maitland has 13 charging stations in the DOE registry with 31 ports. Maitland Sunrail accounts for 6% of the charging ports in Maitland. ChargePoint runs 7 stations in Maitland. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Maitland Sunrail?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 13, 2024, one of 804 stations in Florida with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Maitland Sunrail have?
Maitland Sunrail has 2 charging ports: 2 Level 2.
Does Maitland Sunrail have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Maitland Sunrail have?
Maitland Sunrail has J1772 connectors.
Is Maitland Sunrail open to the public?
Yes. Maitland Sunrail is listed with public access, and its status is available.
Where is Maitland Sunrail?
Maitland Sunrail is at 853 N Orlando Ave, Maitland, FL 32751. Its coordinates are 28.63472, -81.36163.
More EV charging around Maitland
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 330229, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Maitland Sunrail, Maitland, FL (AFDC station 330229)”, https://chargecensus.com/stations/florida/maitland-sunrail-330229 (data as of October 12, 2026).