Lakelandgenesis Genesis Link A
AvailableEV charging station in Lakeland, Florida on the ChargePoint network — 1 DC fast. US DOE AFDC station 375625.
At a glance
Lakelandgenesis Genesis Link A is a public EV charging station at 1250 West Memorial Boulevard in Lakeland, Florida, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jan 15, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 375625 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 15, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
Tesla Destination · Available
- Dunkin' - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Walmart EV Charging8 ports
Walmart · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Century Lakehouse6 ports
Loop · Available
What kind of charging does Lakelandgenesis Genesis Link A offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 72% below the Florida average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Lakelandgenesis Genesis Link A compare with other stations in Lakeland?
Lakeland has 35 charging stations in the DOE registry with 100 ports. Lakelandgenesis Genesis Link A accounts for 1% of the charging ports in Lakeland. ChargePoint runs 15 stations in Lakeland. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Lakelandgenesis Genesis Link A?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 15, 2025, one of 793 stations in Florida with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Lakelandgenesis Genesis Link A have?
Lakelandgenesis Genesis Link A has 1 charging port: 1 DC fast.
Does Lakelandgenesis Genesis Link A have DC fast charging?
Yes. The registry lists 1 DC fast port at Lakelandgenesis Genesis Link A, with CCS connectors.
What connectors does Lakelandgenesis Genesis Link A have?
Lakelandgenesis Genesis Link A has CCS connectors.
Is Lakelandgenesis Genesis Link A open to the public?
Yes. Lakelandgenesis Genesis Link A is listed with public access, and its status is available.
Where is Lakelandgenesis Genesis Link A?
Lakelandgenesis Genesis Link A is at 1250 West Memorial Boulevard, Lakeland, FL 33815. Its coordinates are 28.05461, -81.97608.
More EV charging around Lakeland
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 375625, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lakelandgenesis Genesis Link A, Lakeland, FL (AFDC station 375625)”, https://chargecensus.com/stations/florida/lakelandgenesis-genesis-link-a-375625 (data as of October 12, 2026).