ChargeCensus

Lakeland Harley Dcfast Hog

Available

EV charging station in Lakeland, Florida on the ChargePoint network — 1 DC fast. US DOE AFDC station 145336.

At a glance

Lakeland Harley Dcfast Hog is a public EV charging station at 4202 Lakeland Hills Blvd in Lakeland, Florida, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Sep 18, 2019.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID145336
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 18, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
4202 Lakeland Hills Blvd
State
Florida
ZIP
33805
Coordinates
28.09583, -81.95270

Within ~15 km

Nearby charging

What kind of charging does Lakeland Harley Dcfast Hog offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 72% below the Florida average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Lakeland Harley Dcfast Hog compare with other stations in Lakeland?

Lakeland has 35 charging stations in the DOE registry with 100 ports. Lakeland Harley Dcfast Hog accounts for 1% of the charging ports in Lakeland. ChargePoint runs 15 stations in Lakeland. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Lakeland Harley Dcfast Hog?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 18, 2019, one of 162 stations in Florida with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lakeland Harley Dcfast Hog have?

Lakeland Harley Dcfast Hog has 1 charging port: 1 DC fast.

Does Lakeland Harley Dcfast Hog have DC fast charging?

Yes. The registry lists 1 DC fast port at Lakeland Harley Dcfast Hog, with CCS connectors.

What connectors does Lakeland Harley Dcfast Hog have?

Lakeland Harley Dcfast Hog has CCS connectors.

Is Lakeland Harley Dcfast Hog open to the public?

Yes. Lakeland Harley Dcfast Hog is listed with public access, and its status is available.

Where is Lakeland Harley Dcfast Hog?

Lakeland Harley Dcfast Hog is at 4202 Lakeland Hills Blvd, Lakeland, FL 33805. Its coordinates are 28.09583, -81.95270.

More EV charging around Lakeland

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 145336, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lakeland Harley Dcfast Hog, Lakeland, FL (AFDC station 145336)”, https://chargecensus.com/stations/florida/lakeland-harley-dcfast-hog-145336 (data as of October 12, 2026).