L499 Powerlink 2
AvailableEV charging station in Tampa, Florida on the ChargePoint network — 2 DC fast. US DOE AFDC station 397387.
At a glance
L499 Powerlink 2 is a public EV charging station at 9560 North Florida Avenue in Tampa, Florida, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 30, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 397387 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 30, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Blink · Available
Noodoe · Available
- Eastern Ops Center22 ports
ChargeUp · Available
- Grand Center Parking Garage22 ports
ChargeUp · Available
- Test Lab121 ports
Evoke · Available
Blink · Available
What kind of charging does L499 Powerlink 2 offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does L499 Powerlink 2 compare with other stations in Tampa?
Tampa has 252 charging stations in the DOE registry with 979 ports, the 3rd-most of 381 cities and towns in Florida. L499 Powerlink 2 accounts for under 1% of the charging ports in Tampa. ChargePoint runs 106 stations in Tampa. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates L499 Powerlink 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 30, 2025, one of 793 stations in Florida with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does L499 Powerlink 2 have?
L499 Powerlink 2 has 2 charging ports: 2 DC fast.
Does L499 Powerlink 2 have DC fast charging?
Yes. The registry lists 2 DC fast ports at L499 Powerlink 2, with CCS connectors.
What connectors does L499 Powerlink 2 have?
L499 Powerlink 2 has CCS connectors.
Is L499 Powerlink 2 open to the public?
Yes. L499 Powerlink 2 is listed with public access, and its status is available.
Where is L499 Powerlink 2?
L499 Powerlink 2 is at 9560 North Florida Avenue, Tampa, FL 33612. Its coordinates are 28.03890, -82.45997.
More EV charging around Tampa
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 397387, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “L499 Powerlink 2, Tampa, FL (AFDC station 397387)”, https://chargecensus.com/stations/florida/l499-powerlink-2-397387 (data as of October 12, 2026).