ChargeCensus

L499 Cp6k-2

Available

EV charging station in Tampa, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 388614.

At a glance

L499 Cp6k-2 is a public EV charging station at 9530 N Florida Ave in Tampa, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 25, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID388614
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 25, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
9530 N Florida Ave
City
Tampa
State
Florida
ZIP
33612
Coordinates
28.03832, -82.46035

Within ~15 km

Nearby charging

What kind of charging does L499 Cp6k-2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does L499 Cp6k-2 compare with other stations in Tampa?

Tampa has 252 charging stations in the DOE registry with 979 ports, the 3rd-most of 381 cities and towns in Florida. L499 Cp6k-2 accounts for under 1% of the charging ports in Tampa. ChargePoint runs 106 stations in Tampa. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates L499 Cp6k-2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 25, 2025, one of 793 stations in Florida with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does L499 Cp6k-2 have?

L499 Cp6k-2 has 2 charging ports: 2 Level 2.

Does L499 Cp6k-2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does L499 Cp6k-2 have?

L499 Cp6k-2 has J1772 connectors.

Is L499 Cp6k-2 open to the public?

Yes. L499 Cp6k-2 is listed with public access, and its status is available.

Where is L499 Cp6k-2?

L499 Cp6k-2 is at 9530 N Florida Ave, Tampa, FL 33612. Its coordinates are 28.03832, -82.46035.

More EV charging around Tampa

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 388614, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “L499 Cp6k-2, Tampa, FL (AFDC station 388614)”, https://chargecensus.com/stations/florida/l499-cp6k-2-388614 (data as of October 12, 2026).