ChargeCensus

Jenkins Nissan

Available

EV charging station in Lakeland, Florida, not on a charging network — 1 DC fast · 1 Level 2. US DOE AFDC station 46582.

At a glance

Jenkins Nissan is a public EV charging station at 4401 State Rd 33 N in Lakeland, Florida, not attached to a charging network. It has 2 charging ports (1 DC fast · 1 Level 2) with CHAdeMO and J1772 connectors. The US DOE registry lists it as available, open since Jan 31, 2012.

Total ports
2
DC fast
1
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID46582
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityCar dealership
Open dateJan 31, 2012
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
4401 State Rd 33 N
State
Florida
ZIP
33805
Coordinates
28.09826, -81.94968

Within ~15 km

Nearby charging

What kind of charging does Jenkins Nissan offer?

Of its 2 ports, 1 is DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a car dealership location.

How does Jenkins Nissan compare with other stations in Lakeland?

Lakeland has 35 charging stations in the DOE registry with 100 ports. Jenkins Nissan accounts for 2% of the charging ports in Lakeland. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Jenkins Nissan?

Jenkins Nissan is listed as non-networked: its chargers are not run through a charging-network account. Florida has 385 non-networked stations, 8% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 31, 2012, one of 93 stations in Florida with a 2012 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Jenkins Nissan have?

Jenkins Nissan has 2 charging ports: 1 DC fast · 1 Level 2.

Does Jenkins Nissan have DC fast charging?

Yes. The registry lists 1 DC fast port at Jenkins Nissan, with CHAdeMO connectors.

What connectors does Jenkins Nissan have?

Jenkins Nissan has CHAdeMO and J1772 connectors.

Is charging at Jenkins Nissan free?

Pricing as reported to the DOE registry: Free.

Is Jenkins Nissan open to the public?

Yes. Jenkins Nissan is listed with public access, and its status is available.

Where is Jenkins Nissan?

Jenkins Nissan is at 4401 State Rd 33 N, Lakeland, FL 33805. Its coordinates are 28.09826, -81.94968.

More EV charging around Lakeland

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 46582, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Jenkins Nissan, Lakeland, FL (AFDC station 46582)”, https://chargecensus.com/stations/florida/jenkins-nissan-46582 (data as of October 12, 2026).