ChargeCensus

GPO - Parking Structure

Available

EV charging station in Pensacola, Florida on the Blink network — 14 Level 2. US DOE AFDC station 309999.

At a glance

GPO - Parking Structure is a public EV charging station at 5500 Heritage Oaks Drive in Pensacola, Florida, on the Blink network. It has 14 charging ports (14 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 3, 2020.

Total ports
14
DC fast
0
Level 2
14
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID309999
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJun 3, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
5500 Heritage Oaks Drive
State
Florida
ZIP
32526
Coordinates
30.53742, -87.35478

Within ~15 km

Nearby charging

What kind of charging does GPO - Parking Structure offer?

Of its 14 ports, 14 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 4 times the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does GPO - Parking Structure compare with other stations in Pensacola?

Pensacola has 47 charging stations in the DOE registry with 158 ports, the 20th-most of 381 cities and towns in Florida. GPO - Parking Structure accounts for 9% of the charging ports in Pensacola. Blink runs 5 stations in Pensacola. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates GPO - Parking Structure?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 698 of those stations are in Florida, 14% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 3, 2020, one of 239 stations in Florida with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does GPO - Parking Structure have?

GPO - Parking Structure has 14 charging ports: 14 Level 2.

Does GPO - Parking Structure have DC fast charging?

No. The registry lists no DC fast ports here; its 14 ports are all Level 2.

What connectors does GPO - Parking Structure have?

GPO - Parking Structure has J1772 connectors.

Is GPO - Parking Structure open to the public?

Yes. GPO - Parking Structure is listed with public access, and its status is available.

Where is GPO - Parking Structure?

GPO - Parking Structure is at 5500 Heritage Oaks Drive, Pensacola, FL 32526. Its coordinates are 30.53742, -87.35478.

More EV charging around Pensacola

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 309999, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “GPO - Parking Structure, Pensacola, FL (AFDC station 309999)”, https://chargecensus.com/stations/florida/gpo-parking-structure-309999 (data as of October 12, 2026).