ChargeCensus

Georgetown at Celebration

Available

EV charging station in Celebration, Florida on the ChargeUp network — 8 Level 2. US DOE AFDC station 335646.

At a glance

Georgetown at Celebration is a public EV charging station at 300 Grand Magnolia Ave in Celebration, Florida, on the ChargeUp network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 5, 2024.

Total ports
8
DC fast
0
Level 2
8
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID335646
NetworkChargeUp
StatusAvailable (E)
AccessPublic
Open dateMay 5, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargeUp

Operates 324 stations in the DOE registry — view the full network →

Location

Address
300 Grand Magnolia Ave
City
Celebration
State
Florida
ZIP
34747
Coordinates
28.32619, -81.53020

Within ~15 km

Nearby charging

What kind of charging does Georgetown at Celebration offer?

Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.3 times the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Georgetown at Celebration compare with other stations in Celebration?

Celebration has 6 charging stations in the DOE registry with 36 ports. Georgetown at Celebration accounts for 22% of the charging ports in Celebration. ChargeUp runs 2 stations in Celebration. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Georgetown at Celebration?

ChargeUp operates 324 stations in the registry across 9 states, with 36 DC fast and 1,111 Level 2 ports in total. 296 of those stations are in Florida, 6% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 5, 2024, one of 804 stations in Florida with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Georgetown at Celebration have?

Georgetown at Celebration has 8 charging ports: 8 Level 2.

Does Georgetown at Celebration have DC fast charging?

No. The registry lists no DC fast ports here; its 8 ports are all Level 2.

What connectors does Georgetown at Celebration have?

Georgetown at Celebration has J1772 connectors.

Is Georgetown at Celebration open to the public?

Yes. Georgetown at Celebration is listed with public access, and its status is available.

Where is Georgetown at Celebration?

Georgetown at Celebration is at 300 Grand Magnolia Ave, Celebration, FL 34747. Its coordinates are 28.32619, -81.53020.

More EV charging around Celebration

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 335646, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Georgetown at Celebration, Celebration, FL (AFDC station 335646)”, https://chargecensus.com/stations/florida/georgetown-at-celebration-335646 (data as of October 12, 2026).