Fpl Evolution Sba Comm 1
AvailableEV charging station in Boca Raton, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 226025.
At a glance
Fpl Evolution Sba Comm 1 is a public EV charging station at 8051 Congress Ave in Boca Raton, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 21, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 226025 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 21, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 8051 Congress Ave
- City
- Boca Raton
- State
- Florida
- ZIP
- 33487
- Coordinates
- 27.33732, -80.41155
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Alton Central Park Apartments14 ports
Blink · Available
- Wawa - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Sunrise Ford12 ports
ChargeSmart EV · Available
What kind of charging does Fpl Evolution Sba Comm 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Fpl Evolution Sba Comm 1 compare with other stations in Boca Raton?
Boca Raton has 97 charging stations in the DOE registry with 346 ports, the 8th-most of 381 cities and towns in Florida. Fpl Evolution Sba Comm 1 accounts for under 1% of the charging ports in Boca Raton. ChargePoint runs 46 stations in Boca Raton. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Fpl Evolution Sba Comm 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 21, 2022, one of 622 stations in Florida with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Fpl Evolution Sba Comm 1 have?
Fpl Evolution Sba Comm 1 has 2 charging ports: 2 Level 2.
Does Fpl Evolution Sba Comm 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Fpl Evolution Sba Comm 1 have?
Fpl Evolution Sba Comm 1 has J1772 connectors.
Is Fpl Evolution Sba Comm 1 open to the public?
Yes. Fpl Evolution Sba Comm 1 is listed with public access, and its status is available.
Where is Fpl Evolution Sba Comm 1?
Fpl Evolution Sba Comm 1 is at 8051 Congress Ave, Boca Raton, FL 33487. Its coordinates are 27.33732, -80.41155.
More EV charging around Boca Raton
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 226025, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Fpl Evolution Sba Comm 1, Boca Raton, FL (AFDC station 226025)”, https://chargecensus.com/stations/florida/fpl-evolution-sba-comm-1-226025 (data as of October 12, 2026).