ChargeCensus

FPL EVolution - Nocatee Plaza

Available

EV charging station in Ponte Vedra Beach, Florida on the FPL EVolution network — 4 DC fast. US DOE AFDC station 330577.

At a glance

FPL EVolution - Nocatee Plaza is a public EV charging station at 150 Pine Lake Dr in Ponte Vedra Beach, Florida, on the FPL EVolution network. It has 4 charging ports (4 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 14, 2024.

Total ports
4
DC fast
4
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID330577
NetworkFPL EVolution
StatusAvailable (E)
AccessPublic
FacilityShopping center
Open dateMar 14, 2024
Last updated at sourceDec 22, 2025

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: $0.30 per kWh

Charging network

FPL EVolution

Operates 109 stations in the DOE registry — view the full network →

Location

Address
150 Pine Lake Dr
City
Ponte Vedra Beach
State
Florida
ZIP
32081
Coordinates
30.10830, -81.41467

Within ~15 km

Nearby charging

What kind of charging does FPL EVolution - Nocatee Plaza offer?

Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 14% above the Florida average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector. Pricing as reported to the registry: “$0.30 per kWh”. The site is listed as a shopping center location.

How does FPL EVolution - Nocatee Plaza compare with other stations in Ponte Vedra Beach?

Ponte Vedra Beach has 4 charging stations in the DOE registry with 7 ports. FPL EVolution - Nocatee Plaza accounts for 57% of the charging ports in Ponte Vedra Beach. It is the only FPL EVolution station in Ponte Vedra Beach. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates FPL EVolution - Nocatee Plaza?

FPL EVolution operates 109 stations in the registry across 1 states, with 394 DC fast ports in total. 109 of those stations are in Florida, 2% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 14, 2024, one of 804 stations in Florida with a 2024 open date. The station's record was last updated at the source on Dec 22, 2025.

Frequently asked questions

How many chargers does FPL EVolution - Nocatee Plaza have?

FPL EVolution - Nocatee Plaza has 4 charging ports: 4 DC fast.

Does FPL EVolution - Nocatee Plaza have DC fast charging?

Yes. The registry lists 4 DC fast ports at FPL EVolution - Nocatee Plaza, with CHAdeMO and CCS connectors.

What connectors does FPL EVolution - Nocatee Plaza have?

FPL EVolution - Nocatee Plaza has CHAdeMO and CCS connectors.

Is charging at FPL EVolution - Nocatee Plaza free?

Pricing as reported to the DOE registry: $0.30 per kWh.

Is FPL EVolution - Nocatee Plaza open to the public?

Yes. FPL EVolution - Nocatee Plaza is listed with public access, and its status is available.

Where is FPL EVolution - Nocatee Plaza?

FPL EVolution - Nocatee Plaza is at 150 Pine Lake Dr, Ponte Vedra Beach, FL 32081. Its coordinates are 30.10830, -81.41467.

More EV charging around Ponte Vedra Beach

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 330577, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “FPL EVolution - Nocatee Plaza, Ponte Vedra Beach, FL (AFDC station 330577)”, https://chargecensus.com/stations/florida/fpl-evolution-nocatee-plaza-330577 (data as of October 12, 2026).