Fpl Evolution Kennedy Sp Log3
AvailableEV charging station in Merritt Island, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 220820.
At a glance
Fpl Evolution Kennedy Sp Log3 is a public EV charging station at 1547 Contractor's Road Kennedy Space Center in Merritt Island, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 7, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 220820 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 7, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1547 Contractor's Road Kennedy Space Center
- City
- Merritt Island
- State
- Florida
- ZIP
- 32899
- Coordinates
- 28.51512, -80.68282
Within ~15 km
Nearby charging
- Kennedy Space Center62 ports
Non-networked · Available
Tesla Destination · Available
Tesla Destination · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Flying J 10966 ports
EVgo · Available
What kind of charging does Fpl Evolution Kennedy Sp Log3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Fpl Evolution Kennedy Sp Log3 compare with other stations in Merritt Island?
Merritt Island has 16 charging stations in the DOE registry with 31 ports. Fpl Evolution Kennedy Sp Log3 accounts for 6% of the charging ports in Merritt Island. ChargePoint runs 15 stations in Merritt Island. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Fpl Evolution Kennedy Sp Log3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 7, 2022, one of 622 stations in Florida with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Fpl Evolution Kennedy Sp Log3 have?
Fpl Evolution Kennedy Sp Log3 has 2 charging ports: 2 Level 2.
Does Fpl Evolution Kennedy Sp Log3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Fpl Evolution Kennedy Sp Log3 have?
Fpl Evolution Kennedy Sp Log3 has J1772 connectors.
Is Fpl Evolution Kennedy Sp Log3 open to the public?
Yes. Fpl Evolution Kennedy Sp Log3 is listed with public access, and its status is available.
Where is Fpl Evolution Kennedy Sp Log3?
Fpl Evolution Kennedy Sp Log3 is at 1547 Contractor's Road Kennedy Space Center, Merritt Island, FL 32899. Its coordinates are 28.51512, -80.68282.
More EV charging around Merritt Island
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 220820, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Fpl Evolution Kennedy Sp Log3, Merritt Island, FL (AFDC station 220820)”, https://chargecensus.com/stations/florida/fpl-evolution-kennedy-sp-log3-220820 (data as of October 12, 2026).