Fpl Evolution Chico'S #3
AvailableEV charging station in Fort Myers, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 205612.
At a glance
Fpl Evolution Chico'S #3 is a public EV charging station at 11215 Metro Pkwy in Fort Myers, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 29, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 205612 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 29, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 11215 Metro Pkwy
- City
- Fort Myers
- State
- Florida
- ZIP
- 33966
- Coordinates
- 26.57933, -81.84940
Within ~15 km
Nearby charging
- Miromar Outlets16 ports
Non-networked · Available
- Estero, FL - Tesla Destination16 ports
Tesla Destination · Available
- Estero, FL - Tesla Supercharger16 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Cape Coral CDJR11 ports
ChargeSmart EV · Available
What kind of charging does Fpl Evolution Chico'S #3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Fpl Evolution Chico'S #3 compare with other stations in Fort Myers?
Fort Myers has 69 charging stations in the DOE registry with 180 ports, the 12th-most of 381 cities and towns in Florida. Fpl Evolution Chico'S #3 accounts for 1% of the charging ports in Fort Myers. ChargePoint runs 39 stations in Fort Myers. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Fpl Evolution Chico'S #3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 29, 2022, one of 622 stations in Florida with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Fpl Evolution Chico'S #3 have?
Fpl Evolution Chico'S #3 has 2 charging ports: 2 Level 2.
Does Fpl Evolution Chico'S #3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Fpl Evolution Chico'S #3 have?
Fpl Evolution Chico'S #3 has J1772 connectors.
Is Fpl Evolution Chico'S #3 open to the public?
Yes. Fpl Evolution Chico'S #3 is listed with public access, and its status is available.
Where is Fpl Evolution Chico'S #3?
Fpl Evolution Chico'S #3 is at 11215 Metro Pkwy, Fort Myers, FL 33966. Its coordinates are 26.57933, -81.84940.
More EV charging around Fort Myers
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 205612, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Fpl Evolution Chico'S #3, Fort Myers, FL (AFDC station 205612)”, https://chargecensus.com/stations/florida/fpl-evolution-chico-s-3-205612 (data as of October 12, 2026).