Florida Power & Light - Turkey Point Plant
AvailableEV charging station in Homestead, Florida, not on a charging network — 22 Level 2. US DOE AFDC station 70045.
At a glance
Florida Power & Light - Turkey Point Plant is a private EV charging station at 9700 SW 344 St in Homestead, Florida, not attached to a charging network. It has 22 charging ports (22 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 1, 2015.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 70045 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Utility |
| Open date | Dec 1, 2015 |
| Last updated at source | Dec 22, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
IONNA · Available
- Bay Point Rentals7 ports
ChargeLab · Available
Blink · Temporarily unavailable
What kind of charging does Florida Power & Light - Turkey Point Plant offer?
Of its 22 ports, 22 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 6.3 times the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location. It is flagged as workplace charging.
How does Florida Power & Light - Turkey Point Plant compare with other stations in Homestead?
Homestead has 22 charging stations in the DOE registry with 89 ports. Florida Power & Light - Turkey Point Plant accounts for 25% of the charging ports in Homestead. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Florida Power & Light - Turkey Point Plant?
Florida Power & Light - Turkey Point Plant is listed as non-networked: its chargers are not run through a charging-network account. Florida has 385 non-networked stations, 8% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Dec 1, 2015, one of 72 stations in Florida with a 2015 open date. The station's record was last updated at the source on Dec 22, 2025.
Frequently asked questions
How many chargers does Florida Power & Light - Turkey Point Plant have?
Florida Power & Light - Turkey Point Plant has 22 charging ports: 22 Level 2.
Does Florida Power & Light - Turkey Point Plant have DC fast charging?
No. The registry lists no DC fast ports here; its 22 ports are all Level 2.
What connectors does Florida Power & Light - Turkey Point Plant have?
Florida Power & Light - Turkey Point Plant has J1772 connectors.
Is Florida Power & Light - Turkey Point Plant open to the public?
No. Florida Power & Light - Turkey Point Plant is listed with private access.
Where is Florida Power & Light - Turkey Point Plant?
Florida Power & Light - Turkey Point Plant is at 9700 SW 344 St, Homestead, FL 33035. Its coordinates are 25.44851, -80.34999.
More EV charging around Homestead
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 70045, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Florida Power & Light - Turkey Point Plant, Homestead, FL (AFDC station 70045)”, https://chargecensus.com/stations/florida/florida-power-light-turkey-point-plant-70045 (data as of October 12, 2026).