ChargeCensus

Dunedin City Hall

Available

EV charging station in Dunedin, Florida on the ChargeUp network — 7 Level 2. US DOE AFDC station 313967.

At a glance

Dunedin City Hall is a public EV charging station at 737 Louden Ave in Dunedin, Florida, on the ChargeUp network. It has 7 charging ports (7 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 17, 2023.

Total ports
7
DC fast
0
Level 2
7
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID313967
NetworkChargeUp
StatusAvailable (E)
AccessPublic
Open dateOct 17, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargeUp

Operates 324 stations in the DOE registry — view the full network →

Location

Address
737 Louden Ave
City
Dunedin
State
Florida
ZIP
34698
Coordinates
28.01161, -82.78448

Within ~15 km

Nearby charging

What kind of charging does Dunedin City Hall offer?

Of its 7 ports, 7 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Dunedin City Hall compare with other stations in Dunedin?

Dunedin has 7 charging stations in the DOE registry with 21 ports. Dunedin City Hall accounts for 33% of the charging ports in Dunedin. ChargeUp runs 3 stations in Dunedin. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Dunedin City Hall?

ChargeUp operates 324 stations in the registry across 9 states, with 36 DC fast and 1,111 Level 2 ports in total. 296 of those stations are in Florida, 6% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 17, 2023, one of 612 stations in Florida with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Dunedin City Hall have?

Dunedin City Hall has 7 charging ports: 7 Level 2.

Does Dunedin City Hall have DC fast charging?

No. The registry lists no DC fast ports here; its 7 ports are all Level 2.

What connectors does Dunedin City Hall have?

Dunedin City Hall has J1772 connectors.

Is Dunedin City Hall open to the public?

Yes. Dunedin City Hall is listed with public access, and its status is available.

Where is Dunedin City Hall?

Dunedin City Hall is at 737 Louden Ave, Dunedin, FL 34698. Its coordinates are 28.01161, -82.78448.

More EV charging around Dunedin

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 313967, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Dunedin City Hall, Dunedin, FL (AFDC station 313967)”, https://chargecensus.com/stations/florida/dunedin-city-hall-313967 (data as of October 12, 2026).