ChargeCensus

Don Cesar Hotel EV Charger 2

Available

EV charging station in Saint Pete Beach, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 171548.

At a glance

Don Cesar Hotel EV Charger 2 is a public EV charging station at 3400 Gulf Blvd in Saint Pete Beach, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID171548
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
3400 Gulf Blvd
City
Saint Pete Beach
State
Florida
ZIP
33706
Coordinates
27.70935, -82.73672

Within ~15 km

Nearby charging

What kind of charging does Don Cesar Hotel EV Charger 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Don Cesar Hotel EV Charger 2 compare with other stations in Saint Pete Beach?

Saint Pete Beach has 2 charging stations in the DOE registry with 4 ports. Don Cesar Hotel EV Charger 2 accounts for 50% of the charging ports in Saint Pete Beach. ChargePoint runs 2 stations in Saint Pete Beach. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Don Cesar Hotel EV Charger 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 485 stations in Florida with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Don Cesar Hotel EV Charger 2 have?

Don Cesar Hotel EV Charger 2 has 2 charging ports: 2 Level 2.

Does Don Cesar Hotel EV Charger 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Don Cesar Hotel EV Charger 2 have?

Don Cesar Hotel EV Charger 2 has J1772 connectors.

Is Don Cesar Hotel EV Charger 2 open to the public?

Yes. Don Cesar Hotel EV Charger 2 is listed with public access, and its status is available.

Where is Don Cesar Hotel EV Charger 2?

Don Cesar Hotel EV Charger 2 is at 3400 Gulf Blvd, Saint Pete Beach, FL 33706. Its coordinates are 27.70935, -82.73672.

More EV charging around Saint Pete Beach

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 171548, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Don Cesar Hotel EV Charger 2, Saint Pete Beach, FL (AFDC station 171548)”, https://chargecensus.com/stations/florida/don-cesar-hotel-ev-charger-2-171548 (data as of October 12, 2026).