ChargeCensus

Don Cesar Hotel EV Charger 01

Available

EV charging station in Saint Pete Beach, Florida on the ChargePoint network — 2 Level 2. US DOE AFDC station 42136.

At a glance

Don Cesar Hotel EV Charger 01 is a public EV charging station at 3400 Gulf Blvd in Saint Pete Beach, Florida, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 15, 2011.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID42136
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 15, 2011
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
3400 Gulf Blvd
City
Saint Pete Beach
State
Florida
ZIP
33706
Coordinates
27.70944, -82.73673

Within ~15 km

Nearby charging

What kind of charging does Don Cesar Hotel EV Charger 01 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Don Cesar Hotel EV Charger 01 compare with other stations in Saint Pete Beach?

Saint Pete Beach has 2 charging stations in the DOE registry with 4 ports. Don Cesar Hotel EV Charger 01 accounts for 50% of the charging ports in Saint Pete Beach. ChargePoint runs 2 stations in Saint Pete Beach. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Don Cesar Hotel EV Charger 01?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 15, 2011, one of 46 stations in Florida with a 2011 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Don Cesar Hotel EV Charger 01 have?

Don Cesar Hotel EV Charger 01 has 2 charging ports: 2 Level 2.

Does Don Cesar Hotel EV Charger 01 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Don Cesar Hotel EV Charger 01 have?

Don Cesar Hotel EV Charger 01 has J1772 connectors.

Is Don Cesar Hotel EV Charger 01 open to the public?

Yes. Don Cesar Hotel EV Charger 01 is listed with public access, and its status is available.

Where is Don Cesar Hotel EV Charger 01?

Don Cesar Hotel EV Charger 01 is at 3400 Gulf Blvd, Saint Pete Beach, FL 33706. Its coordinates are 27.70944, -82.73673.

More EV charging around Saint Pete Beach

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 42136, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Don Cesar Hotel EV Charger 01, Saint Pete Beach, FL (AFDC station 42136)”, https://chargecensus.com/stations/florida/don-cesar-hotel-ev-charger-01-42136 (data as of October 12, 2026).