Carlton at Robinson Gateway Maintenance Building
AvailableEV charging station in Palmetto, Florida on the Blink network — 2 Level 2. US DOE AFDC station 458724.
At a glance
Carlton at Robinson Gateway Maintenance Building is a public EV charging station at 7440 Greenlaw Lane in Palmetto, Florida, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 4, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458724 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | May 4, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Gateway Commons Apartments22 ports
Blink · Available
Tesla Supercharger · Available
IONNA · Available
Mercedes-Benz HPC · Available
- Marlowe Lake Manatee8 ports
Blink · Available
Tesla Supercharger · Available
What kind of charging does Carlton at Robinson Gateway Maintenance Building offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Carlton at Robinson Gateway Maintenance Building compare with other stations in Palmetto?
Palmetto has 13 charging stations in the DOE registry with 46 ports. Carlton at Robinson Gateway Maintenance Building accounts for 4% of the charging ports in Palmetto. Blink runs 4 stations in Palmetto. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Carlton at Robinson Gateway Maintenance Building?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 698 of those stations are in Florida, 14% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 4, 2026, one of 554 stations in Florida with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Carlton at Robinson Gateway Maintenance Building have?
Carlton at Robinson Gateway Maintenance Building has 2 charging ports: 2 Level 2.
Does Carlton at Robinson Gateway Maintenance Building have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Carlton at Robinson Gateway Maintenance Building have?
Carlton at Robinson Gateway Maintenance Building has J1772 connectors.
Is Carlton at Robinson Gateway Maintenance Building open to the public?
Yes. Carlton at Robinson Gateway Maintenance Building is listed with public access, and its status is available.
Where is Carlton at Robinson Gateway Maintenance Building?
Carlton at Robinson Gateway Maintenance Building is at 7440 Greenlaw Lane, Palmetto, FL 34221. Its coordinates are 27.60418, -82.48998.
More EV charging around Palmetto
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458724, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Carlton at Robinson Gateway Maintenance Building, Palmetto, FL (AFDC station 458724)”, https://chargecensus.com/stations/florida/carlton-at-robinson-gateway-maintenance-building-458724 (data as of October 12, 2026).