Axios Construction Services
AvailableEV charging station in Fern Park, Florida on the ChargeUp network — 2 Level 2. US DOE AFDC station 354389.
At a glance
Axios Construction Services is a public EV charging station at 2905 Lakeview Drive in Fern Park, Florida, on the ChargeUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 29, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 354389 |
| Network | ChargeUp |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 29, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2905 Lakeview Drive
- City
- Fern Park
- State
- Florida
- ZIP
- 32730
- Coordinates
- 28.66032, -81.34282
Within ~15 km
Nearby charging
- VISN 8/Orlando VAMC (675)_Mobile20 ports
Non-networked · Available
- Robinson Hub18 ports
ChargeUp · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
ChargeUp · Available
Tesla Supercharger · Available
What kind of charging does Axios Construction Services offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Axios Construction Services compare with other stations in Fern Park?
Fern Park has 1 charging station in the DOE registry with 2 ports. It is the only ChargeUp station in Fern Park. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates Axios Construction Services?
ChargeUp operates 324 stations in the registry across 9 states, with 36 DC fast and 1,111 Level 2 ports in total. 296 of those stations are in Florida, 6% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 29, 2024, one of 804 stations in Florida with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Axios Construction Services have?
Axios Construction Services has 2 charging ports: 2 Level 2.
Does Axios Construction Services have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Axios Construction Services have?
Axios Construction Services has J1772 connectors.
Is Axios Construction Services open to the public?
Yes. Axios Construction Services is listed with public access, and its status is available.
Where is Axios Construction Services?
Axios Construction Services is at 2905 Lakeview Drive, Fern Park, FL 32730. Its coordinates are 28.66032, -81.34282.
More EV charging around Fern Park
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 354389, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Axios Construction Services, Fern Park, FL (AFDC station 354389)”, https://chargecensus.com/stations/florida/axios-construction-services-354389 (data as of October 12, 2026).