An Toyota Cpf50 2
AvailableEV charging station in Pinellas Park, Florida on the ChargePoint network — 1 Level 2. US DOE AFDC station 463588.
At a glance
An Toyota Cpf50 2 is a public EV charging station at 8501 U.S. 19 in Pinellas Park, Florida, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 11, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 463588 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 11, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 8501 U.S. 19
- City
- Pinellas Park
- State
- Florida
- ZIP
- 33781
- Coordinates
- 27.84875, -82.68908
Within ~15 km
Nearby charging
- Target - Tesla Supercharger24 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- 1701 Central12 ports
Blink · Available
- Vology - Tesla Destination12 ports
Tesla Destination · Available
- East Garage 1st Floor10 ports
ChargeUp · Available
What kind of charging does An Toyota Cpf50 2 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 72% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does An Toyota Cpf50 2 compare with other stations in Pinellas Park?
Pinellas Park has 12 charging stations in the DOE registry with 56 ports. An Toyota Cpf50 2 accounts for 2% of the charging ports in Pinellas Park. ChargePoint runs 4 stations in Pinellas Park. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates An Toyota Cpf50 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 11, 2026, one of 554 stations in Florida with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does An Toyota Cpf50 2 have?
An Toyota Cpf50 2 has 1 charging port: 1 Level 2.
Does An Toyota Cpf50 2 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does An Toyota Cpf50 2 have?
An Toyota Cpf50 2 has J1772 connectors.
Is An Toyota Cpf50 2 open to the public?
Yes. An Toyota Cpf50 2 is listed with public access, and its status is available.
Where is An Toyota Cpf50 2?
An Toyota Cpf50 2 is at 8501 U.S. 19, Pinellas Park, FL 33781. Its coordinates are 27.84875, -82.68908.
More EV charging around Pinellas Park
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 463588, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “An Toyota Cpf50 2, Pinellas Park, FL (AFDC station 463588)”, https://chargecensus.com/stations/florida/an-toyota-cpf50-2-463588 (data as of October 12, 2026).