ChargeCensus

Alan Jay Nissan

Available

EV charging station in Sebring, Florida, not on a charging network — 1 DC fast · 1 Level 2. US DOE AFDC station 39975.

At a glance

Alan Jay Nissan is a public EV charging station at 1700 Flare Rd in Sebring, Florida, not attached to a charging network. It has 2 charging ports (1 DC fast · 1 Level 2) with CHAdeMO and J1772 connectors. The US DOE registry lists it as available, open since Jan 16, 2017.

Total ports
2
DC fast
1
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID39975
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityCar dealership
Open dateJan 16, 2017
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
1700 Flare Rd
City
Sebring
State
Florida
ZIP
33870
Coordinates
27.48592, -81.48172

Within ~15 km

Nearby charging

What kind of charging does Alan Jay Nissan offer?

Of its 2 ports, 1 is DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a car dealership location.

How does Alan Jay Nissan compare with other stations in Sebring?

Sebring has 7 charging stations in the DOE registry with 22 ports. Alan Jay Nissan accounts for 9% of the charging ports in Sebring. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Alan Jay Nissan?

Alan Jay Nissan is listed as non-networked: its chargers are not run through a charging-network account. Florida has 385 non-networked stations, 8% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 16, 2017, one of 119 stations in Florida with a 2017 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Alan Jay Nissan have?

Alan Jay Nissan has 2 charging ports: 1 DC fast · 1 Level 2.

Does Alan Jay Nissan have DC fast charging?

Yes. The registry lists 1 DC fast port at Alan Jay Nissan, with CHAdeMO connectors.

What connectors does Alan Jay Nissan have?

Alan Jay Nissan has CHAdeMO and J1772 connectors.

Is charging at Alan Jay Nissan free?

Pricing as reported to the DOE registry: Free.

Is Alan Jay Nissan open to the public?

Yes. Alan Jay Nissan is listed with public access, and its status is available.

Where is Alan Jay Nissan?

Alan Jay Nissan is at 1700 Flare Rd, Sebring, FL 33870. Its coordinates are 27.48592, -81.48172.

More EV charging around Sebring

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 39975, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Alan Jay Nissan, Sebring, FL (AFDC station 39975)”, https://chargecensus.com/stations/florida/alan-jay-nissan-39975 (data as of October 12, 2026).