500 Building
AvailableEV charging station in St. Petersburg, Florida on the ChargeUp network — 2 Level 2. US DOE AFDC station 313984.
At a glance
500 Building is a public EV charging station at 501 6th Ave S, in St. Petersburg, Florida, on the ChargeUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 17, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 313984 |
| Network | ChargeUp |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 17, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 501 6th Ave S,
- City
- St. Petersburg
- State
- Florida
- ZIP
- 33701
- Coordinates
- 27.76471, -82.64019
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- 1701 Central12 ports
Blink · Available
Tesla Destination · Available
- East Garage 1st Floor10 ports
ChargeUp · Available
Tesla Destination · Available
What kind of charging does 500 Building offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 500 Building compare with other stations in St. Petersburg?
St. Petersburg has 50 charging stations in the DOE registry with 155 ports, the 19th-most of 381 cities and towns in Florida. 500 Building accounts for 1% of the charging ports in St. Petersburg. ChargeUp runs 7 stations in St. Petersburg. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.
Who operates 500 Building?
ChargeUp operates 324 stations in the registry across 9 states, with 36 DC fast and 1,111 Level 2 ports in total. 296 of those stations are in Florida, 6% of the state's 4,858.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 17, 2023, one of 612 stations in Florida with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 500 Building have?
500 Building has 2 charging ports: 2 Level 2.
Does 500 Building have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 500 Building have?
500 Building has J1772 connectors.
Is 500 Building open to the public?
Yes. 500 Building is listed with public access, and its status is available.
Where is 500 Building?
500 Building is at 501 6th Ave S,, St. Petersburg, FL 33701. Its coordinates are 27.76471, -82.64019.
More EV charging around St. Petersburg
Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 313984, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “500 Building, St. Petersburg, FL (AFDC station 313984)”, https://chargecensus.com/stations/florida/500-building-313984 (data as of October 12, 2026).