ChargeCensus

49th Street N

Available

EV charging station in St. Petersburg, Florida on the ChargeUp network — 6 Level 2. US DOE AFDC station 335610.

At a glance

49th Street N is a public EV charging station at 14250 Street N in St. Petersburg, Florida, on the ChargeUp network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 5, 2024.

Total ports
6
DC fast
0
Level 2
6
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID335610
NetworkChargeUp
StatusAvailable (E)
AccessPublic
Open dateMay 5, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargeUp

Operates 324 stations in the DOE registry — view the full network →

Location

Address
14250 Street N
State
Florida
ZIP
33762
Coordinates
27.90069, -82.68614

Within ~15 km

Nearby charging

What kind of charging does 49th Street N offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% above the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does 49th Street N compare with other stations in St. Petersburg?

St. Petersburg has 50 charging stations in the DOE registry with 155 ports, the 19th-most of 381 cities and towns in Florida. 49th Street N accounts for 4% of the charging ports in St. Petersburg. ChargeUp runs 7 stations in St. Petersburg. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates 49th Street N?

ChargeUp operates 324 stations in the registry across 9 states, with 36 DC fast and 1,111 Level 2 ports in total. 296 of those stations are in Florida, 6% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 5, 2024, one of 804 stations in Florida with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 49th Street N have?

49th Street N has 6 charging ports: 6 Level 2.

Does 49th Street N have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does 49th Street N have?

49th Street N has J1772 connectors.

Is 49th Street N open to the public?

Yes. 49th Street N is listed with public access, and its status is available.

Where is 49th Street N?

49th Street N is at 14250 Street N, St. Petersburg, FL 33762. Its coordinates are 27.90069, -82.68614.

More EV charging around St. Petersburg

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 335610, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “49th Street N, St. Petersburg, FL (AFDC station 335610)”, https://chargecensus.com/stations/florida/49th-street-n-335610 (data as of October 12, 2026).