ChargeCensus

Wcsa Level 3 Esp250

Available

EV charging station in Pagosa Springs, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 191393.

At a glance

Wcsa Level 3 Esp250 is a public EV charging station at USFS-391 in Pagosa Springs, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 23, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 2 nearby

Station record

DOE registry record

FieldValue
AFDC station ID191393
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 23, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
USFS-391
ZIP
81147
Coordinates
37.47317, -106.79240

Within ~15 km

Nearby charging

What kind of charging does Wcsa Level 3 Esp250 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Wcsa Level 3 Esp250 compare with other stations in Pagosa Springs?

Pagosa Springs has 10 charging stations in the DOE registry with 26 ports. Wcsa Level 3 Esp250 accounts for 4% of the charging ports in Pagosa Springs. ChargePoint runs 8 stations in Pagosa Springs. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Wcsa Level 3 Esp250?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2021, one of 450 stations in Colorado with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wcsa Level 3 Esp250 have?

Wcsa Level 3 Esp250 has 1 charging port: 1 DC fast.

Does Wcsa Level 3 Esp250 have DC fast charging?

Yes. The registry lists 1 DC fast port at Wcsa Level 3 Esp250, with CHAdeMO and CCS connectors.

What connectors does Wcsa Level 3 Esp250 have?

Wcsa Level 3 Esp250 has CHAdeMO and CCS connectors.

Is Wcsa Level 3 Esp250 open to the public?

Yes. Wcsa Level 3 Esp250 is listed with public access, and its status is available.

Where is Wcsa Level 3 Esp250?

Wcsa Level 3 Esp250 is at USFS-391, Pagosa Springs, CO 81147. Its coordinates are 37.47317, -106.79240.

More EV charging around Pagosa Springs

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 191393, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wcsa Level 3 Esp250, Pagosa Springs, CO (AFDC station 191393)”, https://chargecensus.com/stations/colorado/wcsa-level-3-esp250-191393 (data as of October 12, 2026).