Verizon - Colorado Springs

Available

EV charging station in Colorado Springs, Colorado, not on a charging network — 8 Level 2. US DOE AFDC station 123326.

At a glance

Verizon - Colorado Springs is a private EV charging station at 2424 Garden of the Gods Rd in Colorado Springs, Colorado, not attached to a charging network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 1, 2019.

Total ports
8
DC fast
0
Level 2
8
Access
Private
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID123326
NetworkNon-networked
StatusAvailable (E)
AccessPrivate
FacilityOffice building
Open dateMay 1, 2019
Last updated at sourceMay 18, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
2424 Garden of the Gods Rd
ZIP
80919
Coordinates
38.89773, -104.87159

Within ~15 km

Nearby charging

What kind of charging does Verizon - Colorado Springs offer?

Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.8 times the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a office building location. It is flagged as workplace charging.

How does Verizon - Colorado Springs compare with other stations in Colorado Springs?

Colorado Springs has 120 charging stations in the DOE registry with 394 ports, the 3rd-most of 204 cities and towns in Colorado. Verizon - Colorado Springs accounts for 2% of the charging ports in Colorado Springs. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Verizon - Colorado Springs?

Verizon - Colorado Springs is listed as non-networked: its chargers are not run through a charging-network account. Colorado has 263 non-networked stations, 8% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on May 1, 2019, one of 94 stations in Colorado with a 2019 open date. The station's record was last updated at the source on May 18, 2026.

Frequently asked questions

How many chargers does Verizon - Colorado Springs have?

Verizon - Colorado Springs has 8 charging ports: 8 Level 2.

Does Verizon - Colorado Springs have DC fast charging?

No. The registry lists no DC fast ports here; its 8 ports are all Level 2.

What connectors does Verizon - Colorado Springs have?

Verizon - Colorado Springs has J1772 connectors.

Is Verizon - Colorado Springs open to the public?

No. Verizon - Colorado Springs is listed with private access.

Where is Verizon - Colorado Springs?

Verizon - Colorado Springs is at 2424 Garden of the Gods Rd, Colorado Springs, CO 80919. Its coordinates are 38.89773, -104.87159.

More EV charging around Colorado Springs

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 123326, weekly full pull.