ChargeCensus

Upper S Lot 2 Upper S Lot 2

Available

EV charging station in Morrison, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 400015.

At a glance

Upper S Lot 2 Upper S Lot 2 is a public EV charging station at 18300 West Alameda Parkway in Morrison, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 19, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID400015
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 19, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
18300 West Alameda Parkway
City
Morrison
ZIP
80465
Coordinates
39.66327, -105.20558

Within ~15 km

Nearby charging

What kind of charging does Upper S Lot 2 Upper S Lot 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Upper S Lot 2 Upper S Lot 2 compare with other stations in Morrison?

Morrison has 9 charging stations in the DOE registry with 16 ports. Upper S Lot 2 Upper S Lot 2 accounts for 13% of the charging ports in Morrison. ChargePoint runs 9 stations in Morrison. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Upper S Lot 2 Upper S Lot 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 19, 2025, one of 568 stations in Colorado with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Upper S Lot 2 Upper S Lot 2 have?

Upper S Lot 2 Upper S Lot 2 has 2 charging ports: 2 Level 2.

Does Upper S Lot 2 Upper S Lot 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Upper S Lot 2 Upper S Lot 2 have?

Upper S Lot 2 Upper S Lot 2 has J1772 connectors.

Is Upper S Lot 2 Upper S Lot 2 open to the public?

Yes. Upper S Lot 2 Upper S Lot 2 is listed with public access, and its status is available.

Where is Upper S Lot 2 Upper S Lot 2?

Upper S Lot 2 Upper S Lot 2 is at 18300 West Alameda Parkway, Morrison, CO 80465. Its coordinates are 39.66327, -105.20558.

More EV charging around Morrison

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 400015, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Upper S Lot 2 Upper S Lot 2, Morrison, CO (AFDC station 400015)”, https://chargecensus.com/stations/colorado/upper-s-lot-2-upper-s-lot-2-400015 (data as of October 12, 2026).