ChargeCensus

United Power Keenesburg1

Available

EV charging station in Keenesburg, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 189386.

At a glance

United Power Keenesburg1 is a public EV charging station at 165 Market St in Keenesburg, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 8, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 1 nearby

Station record

DOE registry record

FieldValue
AFDC station ID189386
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 8, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
165 Market St
City
Keenesburg
ZIP
80643
Coordinates
40.11157, -104.52173

Within ~15 km

Nearby charging

What kind of charging does United Power Keenesburg1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does United Power Keenesburg1 compare with other stations in Keenesburg?

Keenesburg has 1 charging station in the DOE registry with 1 ports. It is the only ChargePoint station in Keenesburg. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates United Power Keenesburg1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 8, 2021, one of 450 stations in Colorado with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does United Power Keenesburg1 have?

United Power Keenesburg1 has 1 charging port: 1 DC fast.

Does United Power Keenesburg1 have DC fast charging?

Yes. The registry lists 1 DC fast port at United Power Keenesburg1, with CHAdeMO and CCS connectors.

What connectors does United Power Keenesburg1 have?

United Power Keenesburg1 has CHAdeMO and CCS connectors.

Is United Power Keenesburg1 open to the public?

Yes. United Power Keenesburg1 is listed with public access, and its status is available.

Where is United Power Keenesburg1?

United Power Keenesburg1 is at 165 Market St, Keenesburg, CO 80643. Its coordinates are 40.11157, -104.52173.

More EV charging around Keenesburg

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 189386, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “United Power Keenesburg1, Keenesburg, CO (AFDC station 189386)”, https://chargecensus.com/stations/colorado/united-power-keenesburg1-189386 (data as of October 12, 2026).