ChargeCensus

Target T2225 (Edgewater, CO)

Available

EV charging station in Edgewater, Colorado on the Electrify America network — 6 DC fast. US DOE AFDC station 152119.

At a glance

Target T2225 (Edgewater, CO) is a public EV charging station at 1985 Sheridan Blvd. in Edgewater, Colorado, on the Electrify America network. It has 6 charging ports (6 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jan 4, 2020.

Total ports
6
DC fast
6
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID152119
NetworkElectrify America
StatusAvailable (E)
AccessPublic
Open dateJan 4, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Electrify America

Operates 1,221 stations in the DOE registry — view the full network →

Location

Address
1985 Sheridan Blvd.
City
Edgewater
ZIP
80214
Coordinates
39.74583, -105.05480

Within ~15 km

Nearby charging

What kind of charging does Target T2225 (Edgewater, CO) offer?

Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about twice the Colorado average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Target T2225 (Edgewater, CO) compare with other stations in Edgewater?

Edgewater has 4 charging stations in the DOE registry with 18 ports. Target T2225 (Edgewater, CO) accounts for 33% of the charging ports in Edgewater. It is the only Electrify America station in Edgewater. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Target T2225 (Edgewater, CO)?

The Volkswagen-founded DC fast network along highway corridors. Electrify America operates 1,221 stations in the registry across 48 states, with 6,029 DC fast and 170 Level 2 ports in total. 48 of those stations are in Colorado, 2% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 4, 2020, one of 215 stations in Colorado with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Target T2225 (Edgewater, CO) have?

Target T2225 (Edgewater, CO) has 6 charging ports: 6 DC fast.

Does Target T2225 (Edgewater, CO) have DC fast charging?

Yes. The registry lists 6 DC fast ports at Target T2225 (Edgewater, CO), with CCS connectors.

What connectors does Target T2225 (Edgewater, CO) have?

Target T2225 (Edgewater, CO) has CCS connectors.

Is Target T2225 (Edgewater, CO) open to the public?

Yes. Target T2225 (Edgewater, CO) is listed with public access, and its status is available.

Where is Target T2225 (Edgewater, CO)?

Target T2225 (Edgewater, CO) is at 1985 Sheridan Blvd., Edgewater, CO 80214. Its coordinates are 39.74583, -105.05480.

More EV charging around Edgewater

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 152119, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Target T2225 (Edgewater, CO), Edgewater, CO (AFDC station 152119)”, https://chargecensus.com/stations/colorado/target-t2225-edgewater-co-152119 (data as of October 12, 2026).