Sterling EV St1 Pl2
AvailableEV charging station in Sterling, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 250657.
At a glance
Sterling EV St1 Pl2 is a public EV charging station at 130 North 4th Street in Sterling, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 12, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 250657 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 12, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 130 North 4th Street
- City
- Sterling
- State
- Colorado
- ZIP
- 80751
- Coordinates
- 40.62523, -103.20898
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Destination · Available
- North Sterling State Park2 ports
Rivian Waypoints · Available
- Sterling EV St1 Pl11 ports
ChargePoint · Available
What kind of charging does Sterling EV St1 Pl2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Sterling EV St1 Pl2 compare with other stations in Sterling?
Sterling has 5 charging stations in the DOE registry with 20 ports. Sterling EV St1 Pl2 accounts for 5% of the charging ports in Sterling. ChargePoint runs 2 stations in Sterling. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Sterling EV St1 Pl2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 12, 2023, one of 410 stations in Colorado with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sterling EV St1 Pl2 have?
Sterling EV St1 Pl2 has 1 charging port: 1 DC fast.
Does Sterling EV St1 Pl2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Sterling EV St1 Pl2, with CHAdeMO and CCS connectors.
What connectors does Sterling EV St1 Pl2 have?
Sterling EV St1 Pl2 has CHAdeMO and CCS connectors.
Is Sterling EV St1 Pl2 open to the public?
Yes. Sterling EV St1 Pl2 is listed with public access, and its status is available.
Where is Sterling EV St1 Pl2?
Sterling EV St1 Pl2 is at 130 North 4th Street, Sterling, CO 80751. Its coordinates are 40.62523, -103.20898.
More EV charging around Sterling
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 250657, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sterling EV St1 Pl2, Sterling, CO (AFDC station 250657)”, https://chargecensus.com/stations/colorado/sterling-ev-st1-pl2-250657 (data as of October 12, 2026).