Sjpi Colorado Left
AvailableEV charging station in Westminster, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 456623.
At a glance
Sjpi Colorado Left is a public EV charging station at 11945 Quantum Parkway Building K in Westminster, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 29, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 456623 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 29, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 11945 Quantum Parkway Building K
- City
- Westminster
- State
- Colorado
- ZIP
- 80021
- Coordinates
- 39.89762, -105.13212
Within ~15 km
Nearby charging
- AMLI Art District41 ports
Loop · Available
- AMLI Denargo Market37 ports
Loop · Available
- Hanover RiNo - Tesla Destination30 ports
Tesla Destination · Available
- AMLI Riverfront Park20 ports
Loop · Available
- Coors Field - 2701 Blake Street16 ports
Flash · Available
- McGregor Square Garage16 ports
Flash · Available
What kind of charging does Sjpi Colorado Left offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Sjpi Colorado Left compare with other stations in Westminster?
Westminster has 78 charging stations in the DOE registry with 160 ports, the 7th-most of 204 cities and towns in Colorado. Sjpi Colorado Left accounts for 1% of the charging ports in Westminster. ChargePoint runs 64 stations in Westminster. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Sjpi Colorado Left?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 29, 2026, one of 432 stations in Colorado with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sjpi Colorado Left have?
Sjpi Colorado Left has 2 charging ports: 2 Level 2.
Does Sjpi Colorado Left have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Sjpi Colorado Left have?
Sjpi Colorado Left has J1772 connectors.
Is Sjpi Colorado Left open to the public?
Yes. Sjpi Colorado Left is listed with public access, and its status is available.
Where is Sjpi Colorado Left?
Sjpi Colorado Left is at 11945 Quantum Parkway Building K, Westminster, CO 80021. Its coordinates are 39.89762, -105.13212.
More EV charging around Westminster
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 456623, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sjpi Colorado Left, Westminster, CO (AFDC station 456623)”, https://chargecensus.com/stations/colorado/sjpi-colorado-left-456623 (data as of October 12, 2026).