Miremonte Cadence 1
AvailableEV charging station in Fort Collins, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 255308.
At a glance
Miremonte Cadence 1 is a public EV charging station at 2555 Joseph Allen Dr in Fort Collins, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 28, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 255308 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 28, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2555 Joseph Allen Dr
- City
- Fort Collins
- State
- Colorado
- ZIP
- 80525
- Coordinates
- 40.55326, -105.04194
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Blink · Available
Autel · Available
Autel · Available
Enertech · Available
- Lakeshore at Centerra8 ports
Enertech · Available
What kind of charging does Miremonte Cadence 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Miremonte Cadence 1 compare with other stations in Fort Collins?
Fort Collins has 115 charging stations in the DOE registry with 259 ports, the 4th-most of 204 cities and towns in Colorado. Miremonte Cadence 1 accounts for under 1% of the charging ports in Fort Collins. ChargePoint runs 68 stations in Fort Collins. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Miremonte Cadence 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 28, 2023, one of 410 stations in Colorado with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Miremonte Cadence 1 have?
Miremonte Cadence 1 has 2 charging ports: 2 Level 2.
Does Miremonte Cadence 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Miremonte Cadence 1 have?
Miremonte Cadence 1 has J1772 connectors.
Is Miremonte Cadence 1 open to the public?
Yes. Miremonte Cadence 1 is listed with public access, and its status is available.
Where is Miremonte Cadence 1?
Miremonte Cadence 1 is at 2555 Joseph Allen Dr, Fort Collins, CO 80525. Its coordinates are 40.55326, -105.04194.
More EV charging around Fort Collins
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 255308, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Miremonte Cadence 1, Fort Collins, CO (AFDC station 255308)”, https://chargecensus.com/stations/colorado/miremonte-cadence-1-255308 (data as of October 12, 2026).