Maverik Dacono Pl2
AvailableEV charging station in Dacono, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 252995.
At a glance
Maverik Dacono Pl2 is a public EV charging station at 127 Laura Way in Dacono, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Feb 2, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 252995 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 2, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 127 Laura Way
- City
- Dacono
- State
- Colorado
- ZIP
- 80514
- Coordinates
- 40.08689, -104.97471
Within ~15 km
Nearby charging
- Service Center12 ports
evGateway · Available
Tesla Supercharger · Available
- Parks - South Sunset10 ports
evGateway · Available
- The Grove Thornton MB.HPC10 ports
Mercedes-Benz HPC · Available
Electrify America · Available
- Vaisala8 ports
ChargePoint · Available
What kind of charging does Maverik Dacono Pl2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Maverik Dacono Pl2 compare with other stations in Dacono?
Dacono has 3 charging stations in the DOE registry with 6 ports. Maverik Dacono Pl2 accounts for 17% of the charging ports in Dacono. ChargePoint runs 2 stations in Dacono. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Maverik Dacono Pl2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 2, 2023, one of 410 stations in Colorado with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Maverik Dacono Pl2 have?
Maverik Dacono Pl2 has 1 charging port: 1 DC fast.
Does Maverik Dacono Pl2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Maverik Dacono Pl2, with CHAdeMO and CCS connectors.
What connectors does Maverik Dacono Pl2 have?
Maverik Dacono Pl2 has CHAdeMO and CCS connectors.
Is Maverik Dacono Pl2 open to the public?
Yes. Maverik Dacono Pl2 is listed with public access, and its status is available.
Where is Maverik Dacono Pl2?
Maverik Dacono Pl2 is at 127 Laura Way, Dacono, CO 80514. Its coordinates are 40.08689, -104.97471.
More EV charging around Dacono
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 252995, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Maverik Dacono Pl2, Dacono, CO (AFDC station 252995)”, https://chargecensus.com/stations/colorado/maverik-dacono-pl2-252995 (data as of October 12, 2026).