ChargeCensus

Grand Lake Dcfc 2

Available

EV charging station in Grand Lake, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 200747.

At a glance

Grand Lake Dcfc 2 is a public EV charging station at 1029 Park Ave in Grand Lake, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Nov 9, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID200747
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 9, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1029 Park Ave
City
Grand Lake
ZIP
80447
Coordinates
40.25221, -105.81818

Within ~15 km

Nearby charging

What kind of charging does Grand Lake Dcfc 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Grand Lake Dcfc 2 compare with other stations in Grand Lake?

Grand Lake has 3 charging stations in the DOE registry with 4 ports. Grand Lake Dcfc 2 accounts for 25% of the charging ports in Grand Lake. ChargePoint runs 3 stations in Grand Lake. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Grand Lake Dcfc 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 9, 2021, one of 450 stations in Colorado with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Grand Lake Dcfc 2 have?

Grand Lake Dcfc 2 has 1 charging port: 1 DC fast.

Does Grand Lake Dcfc 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Grand Lake Dcfc 2, with CHAdeMO and CCS connectors.

What connectors does Grand Lake Dcfc 2 have?

Grand Lake Dcfc 2 has CHAdeMO and CCS connectors.

Is Grand Lake Dcfc 2 open to the public?

Yes. Grand Lake Dcfc 2 is listed with public access, and its status is available.

Where is Grand Lake Dcfc 2?

Grand Lake Dcfc 2 is at 1029 Park Ave, Grand Lake, CO 80447. Its coordinates are 40.25221, -105.81818.

More EV charging around Grand Lake

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 200747, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Grand Lake Dcfc 2, Grand Lake, CO (AFDC station 200747)”, https://chargecensus.com/stations/colorado/grand-lake-dcfc-2-200747 (data as of October 12, 2026).