ChargeCensus

Es1 Salida Pl1

Available

EV charging station in Salida, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 259010.

At a glance

Es1 Salida Pl1 is a public EV charging station at 1 County Road 105 in Salida, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Apr 12, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID259010
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 12, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1 County Road 105
City
Salida
ZIP
81201
Coordinates
38.52348, -105.98390

Within ~15 km

Nearby charging

What kind of charging does Es1 Salida Pl1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.

How does Es1 Salida Pl1 compare with other stations in Salida?

Salida has 13 charging stations in the DOE registry with 36 ports. Es1 Salida Pl1 accounts for 3% of the charging ports in Salida. ChargePoint runs 8 stations in Salida. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Es1 Salida Pl1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 12, 2023, one of 410 stations in Colorado with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Es1 Salida Pl1 have?

Es1 Salida Pl1 has 1 charging port: 1 DC fast.

Does Es1 Salida Pl1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Es1 Salida Pl1, with CCS and NACS (Tesla) connectors.

What connectors does Es1 Salida Pl1 have?

Es1 Salida Pl1 has CCS and NACS (Tesla) connectors.

Is Es1 Salida Pl1 open to the public?

Yes. Es1 Salida Pl1 is listed with public access, and its status is available.

Where is Es1 Salida Pl1?

Es1 Salida Pl1 is at 1 County Road 105, Salida, CO 81201. Its coordinates are 38.52348, -105.98390.

More EV charging around Salida

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 259010, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Es1 Salida Pl1, Salida, CO (AFDC station 259010)”, https://chargecensus.com/stations/colorado/es1-salida-pl1-259010 (data as of October 12, 2026).