ChargeCensus

Eagle Ridge

Available

EV charging station in Loveland, Colorado on the Loop network — 6 Level 2. US DOE AFDC station 399236.

At a glance

Eagle Ridge is a public EV charging station at 5275 Hahns Peak Dr in Loveland, Colorado, on the Loop network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 23, 2023.

Total ports
6
DC fast
0
Level 2
6
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID399236
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateAug 23, 2023
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
5275 Hahns Peak Dr
ZIP
80538
Coordinates
40.41282, -105.00294

Within ~15 km

Nearby charging

What kind of charging does Eagle Ridge offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does Eagle Ridge compare with other stations in Loveland?

Loveland has 67 charging stations in the DOE registry with 211 ports, the 10th-most of 204 cities and towns in Colorado. Eagle Ridge accounts for 3% of the charging ports in Loveland. Loop runs 2 stations in Loveland. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Eagle Ridge?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 38 of those stations are in Colorado, 1% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 23, 2023, one of 410 stations in Colorado with a 2023 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does Eagle Ridge have?

Eagle Ridge has 6 charging ports: 6 Level 2.

Does Eagle Ridge have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does Eagle Ridge have?

Eagle Ridge has J1772 connectors.

Is Eagle Ridge open to the public?

Yes. Eagle Ridge is listed with public access, and its status is available.

Where is Eagle Ridge?

Eagle Ridge is at 5275 Hahns Peak Dr, Loveland, CO 80538. Its coordinates are 40.41282, -105.00294.

More EV charging around Loveland

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 399236, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Eagle Ridge, Loveland, CO (AFDC station 399236)”, https://chargecensus.com/stations/colorado/eagle-ridge-399236 (data as of October 12, 2026).